Double Your Square Footage

The Easy Way

Latest News

Traditionally, second-story additions are intense and disrupting projects: for both the builder and the homeowners. The disruption alone could be enough to deter a family from proceeding with an addition, but that’s AnotherStory’s entire selling point: a second story without disruption.

Traditionally, second-story additions are intense and disrupting projects: for both the builder and the homeowners. The disruption alone could be enough to deter a family from proceeding with an addition, but that’s AnotherStory’s entire selling point: a second story without disruption.

What

are the benefits of

adding a story?

Image

Retain open space

Image

Improve curb appeal

Image

Larger home @ lower tax base

Image

More natural light

Image

Increased energy efficiency

Image

Increased value

Why

would you choose AnotherStory?

Image

No moving required

Image

No short term renting

Image

No disruption to commutes

Image

Dustless renovation*

Image

Privacy protected

Image

Less risk to possessions

What

are the benefits of

adding a story?

Image

Retain open space

Image

Improve curb appeal

Image

Larger home @ lower tax base

Image

More natural light

Image

Increased energy efficiency

Image

Increased value

Why

would you choose AnotherStory?

Image

No moving required

Image

No short term renting

Image

No disruption to commutes

Image

Dustless renovation*

Image

Privacy protected

Image

Less risk to possessions

How

Patented Technology

We build your second story without breaching the first

While you live uninterrupted and dust-free until stair installation

Stairs are installed and cleanup occurs at the end of the process

When

things happen for you

Day 1

Initial Phone Call

Week 1-4

Feasibility Study

Week 4-6

Programming

Week 6-10

Design Development

Week 8-12

Bidding / Value Engineering

Week 12-18

Financing

Week 18-22

Construction Documents / Permitting

Week 22-42

Construction (Dustless)

Week 42-44

Stair Installation

Week 45

Clean Up

When

things happen for you

Day 1

Initial Phone Call

Week 1-4

Feasibility Study

Week 4-6

Programming

Week 6-10

Design Development

Week 8-12

Bidding / Value Engineering

Week 12-18

Financing

Week 18-22

Construction Documents / Permitting

Week 22-42

Construction (Dustless)

Week 42-44

Stair Installation

Week 45

Clean Up

Build Another Story without Moving

Image

In the first three weeks of being able to be in the added square footage, we were able to easily welcome out of town friends with 3 kids... Our kids have been able to retreat to their own spaces upstairs when they need some time away and read books together without having to be in the higher traffic areas of our home. We could not be more grateful for what the added space has added to our days as a family.

Image

In the first three weeks of being able to be in the added square footage, we were able to easily welcome out of town friends with 3 kids... Our kids have been able to retreat to their own spaces upstairs when they need some time away and read books together without having to be in the higher traffic areas of our home. We could not be more grateful for what the added space has added to our days as a family.

Image

Rachel Buie

Birmingham, AL

Image

Rachel Buie

Birmingham, AL

[This] team has more vision, imagination and problem solving ability than all five previous architects (combined) with whom we have done projects. Their design-build approach simplifies multiple meetings and miscommunications between a separate contractor and architect. The end result of our renovation is stunning.

Image

Sheri Spain Long

Birmingham, AL

Image

Sheri Spain Long

Birmingham, AL

Location

Homewood

Birmingham, AL

USA

Copyright 2023 | All Rights Reserved | Terms & Conditions | Privacy Policy